On September 29, 2026, Governor Newsom signed SB 1117, Senator Sabrina Cervantes’ bill that changes how cities charge impact fees on ADUs. It passed the Senate 38–0 and takes effect January 1, 2027.
The change sounds small. For anyone building a two- or three-bedroom ADU in Orange County, it isn’t.
The problem SB 1117 fixes: the fee cliff
Under current California law, an ADU under 750 square feet pays zero impact fees. That part stays.
The problem was what happened at 751 square feet. Once an ADU crossed that line, cities could charge proportional impact fees on the entire unit, including the first 750 square feet that would have been exempt if you’d built one foot smaller.
That created a cliff. A 749 sq ft ADU paid $0 in impact fees. A 760 sq ft ADU could pay five figures. So builders and owners did the rational thing and designed around it. That’s why so many ADUs in OC land at 745–749 square feet, which is usually a one-bedroom or a tight two-bedroom.
What changes on January 1, 2027
SB 1117 lets the first 750 square feet come off the top. For the first and second ADU on a property, impact fees apply only to the interior livable space above 750 square feet.
The existing proportionality rule stays in place. Under state law, an ADU’s impact fees have to be proportional to the size of the primary home. That’s laid out in the HCD ADU Handbook. Put the two rules together and the math looks like this:
Old formula: (ADU sq ft ÷ primary home sq ft) × impact fee for a new single-family home
New formula: ((ADU sq ft − 750) ÷ primary home sq ft) × impact fee for a new single-family home
The Assembly committee analysis uses a simple example: a 1,000 sq ft ADU at $2.50/sq ft goes from $2,500 in fees to $625, because only 250 square feet is chargeable.
What SB 1117 does not change
This matters for budgeting, so be clear on it:
- School fees are not affected. ADUs of 500 sq ft or less are exempt from school fees. Above 500 sq ft, school districts can still charge on the full square footage. The state’s Level 1 residential rate was raised to $5.38/sq ft in January 2026, and some OC districts charge higher Level 2 rates.
- Utility connection and capacity charges are not affected. Water, sewer and electrical upgrades follow their own rules.
- Plan check and permit fees are not impact fees. You’ll still pay those regardless of size.
Orange County impact fee breakdowns: before and after SB 1117
Every OC city sets its own impact fee schedule, which usually covers parks, traffic, drainage, and sometimes fire, police or libraries. So the examples below use an illustrative $30,000 as the impact fee a city would charge on a new single-family home. Plug in your city’s actual number (it’s on the fee estimate your planning counter gives you) and the percentages work the same way.
Example 1: The 800 sq ft “just over the line” ADU
800 sq ft detached ADU behind a 1,600 sq ft house
| Before SB 1117 | After SB 1117 | |
|---|---|---|
| Chargeable sq ft | 800 | 50 |
| Proportion of primary | 50% | 3.1% |
| City impact fees | $15,000 | $938 |
| School fees ($5.38 × 800) | $4,304 | $4,304 |
| Total | $19,304 | $5,242 |
Savings: about $14,000. This is the cliff in action. Fifty extra square feet used to cost $15,000. Now it costs under $1,000.
Example 2: The 1,000 sq ft two-bedroom
1,000 sq ft detached ADU behind a 1,600 sq ft house (a typical Garden Grove, Santa Ana or Anaheim tract lot)
| Before SB 1117 | After SB 1117 | |
|---|---|---|
| Chargeable sq ft | 1,000 | 250 |
| Proportion of primary | 62.5% | 15.6% |
| City impact fees | $18,750 | $4,688 |
| School fees ($5.38 × 1,000) | $5,380 | $5,380 |
| Total | $24,130 | $10,068 |
Savings: about $14,000.
Example 3: The 1,200 sq ft three-bedroom
1,200 sq ft detached ADU behind a 2,000 sq ft house
| Before SB 1117 | After SB 1117 | |
|---|---|---|
| Chargeable sq ft | 1,200 | 450 |
| Proportion of primary | 60% | 22.5% |
| City impact fees | $18,000 | $6,750 |
| School fees ($5.38 × 1,200) | $6,456 | $6,456 |
| Total | $24,456 | $13,206 |
Savings: about $11,250.
Quick rule of thumb: for every $10,000 your city charges on a new single-family home, SB 1117 takes roughly (750 ÷ primary home sq ft) × $10,000 off your ADU’s impact fees. Behind a 1,600 sq ft house, that’s about $4,700 saved per $10,000 of base fee.
OC-specific wrinkles to watch
- Unincorporated Orange County uses a slightly different base. The OC Public Works ADU fee guidance applies the proportion to the multifamily rate for its fee programs, not the single-family rate. The same ratio logic applies; the base number is just smaller.
- Irvine charges some fees differently. Its 2026–27 fee schedule lists a Systems Development Charge based on 1% of building valuation, plus a $5.34/sq ft citywide development impact fee in the Irvine Business Complex area. If you’re building in Irvine, ask planning directly which of those charges they’ll treat as impact fees under the new 750 sq ft deduction.
- Costa Mesa charges park fees on ADUs by city council resolution. In a market where ADU properties have been selling over asking, a lower fee bill on a larger unit goes straight to your equity.
What this means for OC ADU investors and homeowners
1. The 749 sq ft design is no longer automatic. For years the math pushed everyone toward one-bedrooms. Now a 900–1,000 sq ft two-bedroom costs a few thousand more in fees instead of $15,000+ more. Two-bedroom ADUs rent for more and appeal to a much wider tenant pool, including families.
2. Watch your permit timing. SB 1117 takes effect January 1, 2027. Impact fees are generally calculated and paid at permit issuance. If your ADU is over 750 sq ft and your permit would otherwise issue in November or December, ask your city when fees are locked in. Waiting a few weeks could save you five figures.
3. Bigger ADUs change resale value. A property with a 1,000 sq ft two-bed ADU comps differently than one with a 600 sq ft studio. In strong comp markets like Garden Grove and Santa Ana, that’s easier to support. In thinner markets like Buena Park and Fullerton, make sure the rent upside justifies the build cost before you size up.
4. Cities will push back where they can. Local government groups opposed the bill and estimated about $52 million a year in lost fee revenue statewide. Expect some cities to raise their base fee schedules or reclassify charges. Always get a written fee estimate before you commit to a design.
A note on AB 956
SB 1117 had a companion bill on the Governor’s desk: AB 956 (Quirk-Silva), which would allow two detached ADUs on a single-family lot by right. It faced the same September 30 deadline. If it’s signed, the “first and second ADU” language in SB 1117 becomes even more relevant. Two detached ADUs, each getting the 750 sq ft deduction, changes the underwriting on a lot of OC properties. I’ll post an update once the final status is confirmed.
The bottom line
SB 1117 doesn’t make ADUs free. School fees, utility work and permit fees are all still there. But it removes the single most distorting number in ADU design: the jump at 751 square feet. For Orange County owners planning a two- or three-bedroom ADU in 2027, that’s typically $10,000–$15,000 back in the budget.
If you’re weighing whether to build, buy or sell an ADU property in Orange County and want the numbers run on a specific address, or reach out directly.
Dylan Serna | The ADU Realtor | eXp Realty | DRE #02217359
Related Reading
- Why OC cities falling behind on state housing goals is good news for your ADU permit
- The best layout for a 2-bed, 2-bath ADU and why crossing 800 sq ft can pay off
This post is general information, not legal or tax advice. Fee amounts in the examples are illustrative. Confirm actual fees with your city’s planning and building department.